Program · Preliminary brief

Gridline

Up to several hundred megawatts of latent capacity, onboarded in sub-20 MW increments over weeks to months.

Identified
Several hundred MW
Per position
< 20 MW
To onboard
Weeks–months
Across
Several states
01The constraint

Every other input can be procured on a schedule. The grid connection can't.

Finding a site that can take your load is a slow search: one application, one study, one answer at a time.

  1. CapitalOn your date
  2. LandOn your date
  3. SiliconOn your date
  4. Grid connectionOn the grid's date
02Who we are

“We have been the load everyone complains about.”

The accused, and the engineer.

For more than a decade we were the load blamed first. For that same decade we were engineering the opposite: large loads that complement the grid they draw from. We have sat on both sides of the table, and we know what works for each.

03What we do

Grid positions, pre-qualified.

Latent capacity across several states, held in sub-20 MW increments within an expedited interconnection process with a major regional grid operator.

Built forInference developers who intend to be good stewards.

Where a load lands, by size
i

Found before you apply

We model the grid the way an operator does, and find capacity on infrastructure already built.

ii

Sized below the boundary

Under 20 MW, a load sits within local capacity, which is what lets an operator move it quickly.

iii

Shaped to fit

Flexible load that steps aside at the peak, so the grid runs better for having it.

04Our commitments

The Good Steward Standard.

Eight commitments, written down before you commit capital. They formalise what the grid operator already asks of every large load it serves on an expedited basis, so you know what is expected from the start.

01

Ratepayer Protection

02

Firm Cost Responsibility

03

Grid-Responsive Curtailment

04

Ride-Through & Power Quality

05

Water & Noise Stewardship

06

Community Partnership

07

Queue Integrity

08

End-of-Life & Decommissioning

The full Standard is shared with the program brief.

05How it works

The path to getting your project online.

  1. 01Conversation

    Tell us about your project: the load you want to place, and over what horizon.

  2. 02Mutual NDA

    With non-circumvention, before anything substantive is exchanged.

  3. 03Position

    A project outline built to what the operator asks for, submitted on the expedited track.

  4. 04Energize

    Built, commissioned and run to the Good Steward Standard.

06Next step
In compute today, the scarcest resource is a position on the grid.

This page is deliberately high-level. Position sizes, timelines, terms and the specific capacity we hold are in the program brief, shared under mutual NDA. Positions are limited.

Goes straight to our team

Start a conversationTell us about your project. We’ll show you where it belongs.
Which best describes you *
Load you’re planning
Fast-track positions are sub-20 MW; larger loads call for a longer implementation strategy.
Timeline to energize

Used only to respond to you. No mailing lists.